Windows Errors? Fix Them Before They Spread
Repair common Windows errors and clear accumulated junk for a smoother, more stable PC - no reinstall needed.Free scan · no reinstallOutdated Drivers Are Slowing You Down
One free scan finds every outdated or missing driver and matches the right update for your exact hardware.Free scan · exact hardware matchTo join Mitchell Freeway southbound near Stirling and Innaloo, use the Stephenson Avenue southbound on-ramp. It is part of the Stephenson Avenue Extension interchange and uses coordinated ramp signals as part of the Smart Freeway system. The Cedric Street southbound on-ramp is being removed as part of the interchange changes.
Which ramp should you use for Mitchell Freeway southbound?
Follow signs for the Stephenson Avenue southbound on-ramp rather than looking for a Cedric Street southbound entry. Main Roads WA identifies the new ramp as the southbound freeway access and says it is integrated with the Smart Freeway system, including coordinated ramp signals. Allow time to follow the signed approach and obey the signals at the ramp.
The change is part of Phase 2 of the Stephenson Avenue Extension, which extends Stephenson Avenue from Flax Way to the Mitchell Freeway and Cedric Street interchange. The project includes a grade-separated interchange, local road links and changes to existing Cedric Street freeway ramps. Phase 1, from Scarborough Beach Road to Flax Way, opened on 11 February 2022. Main Roads WA: Stephenson Avenue Extension
What is changing at the Cedric Street interchange?
The project replaces the previous ramp arrangement with Stephenson Avenue connections to the freeway in both directions. Main Roads’ project scope includes removing the existing Cedric Street southbound on- and off-ramps and the northbound off-ramp. The southbound route change is therefore part of a wider transition: local traffic between Innaloo, Stirling and nearby areas uses Stephenson Avenue as the new connection as the interchange opens.
Recommended Free Tools
#1 Best Overall
- 6” high-resolution navigator includes map updates of North America
- Hands-free calling when paired with your compatible smartphone with BLUETOOTH technology and convenient Garmin voice assist lets you ask for directions to places you want to go
- Road trip–ready features include the HISTORY database of notable sites, a U.S. national parks directory, Tripadvisor traveler ratings and millions of Foursquare POIs
- Driver alerts for things such as school zones, sharp curves and speed changes help encourage safer driving and increase situational awareness
- Access live traffic, fuel prices, parking, weather and smart notifications when you pair this navigator with your compatible smartphone running the Garmin Drive app
For local access, Main Roads’ December 2025 FAQ described Ellen Stirling Boulevard access via Oswald Street and explained that freeway traffic would use Stephenson Avenue for local access after the Cedric Street northbound off-ramp closed. Follow current road signs and the authority’s route maps, since the FAQ describes staged arrangements from that period. Main Roads WA: December 2025 access changes FAQ
How the northbound ramp changes differ
The northbound change has its own date and should not be confused with the southbound route. The new Stephenson Avenue northbound on-ramp opened at 7am on Friday 3 April 2026. Main Roads said the interchange was then operational with on- and off-ramps connected in both freeway directions.
Rank #2
- Bright, high-resolution 5” glass capacitive touchscreen display lets you easily view your route
- Get more situational awareness with alerts for school zones, speed changes, sharp curves and more
- View food, fuel and rest areas along your active route, and see upcoming cities and milestones
- View Tripadvisor traveler ratings for top-rated restaurants, hotels and attractions to help you make the most of road trips
- Directory of U.S. national parks simplifies navigation to entrances, visitor centers and landmarks within the parks
Main Roads’ March 2026 FAQ described a temporary closure of the Cedric Street northbound on-ramp from 2 April until mid-2026, with detours via Stephenson Avenue or Karrinyup Road depending on the driver’s approach. That was a time-limited notice, not confirmation that the closure remains in force now. Check current signs and notices before travelling. Main Roads WA: March 2026 northbound ramp FAQ
Stirling Station access and other nearby changes
Access to Stirling Station’s southern car park has also changed. Main Roads reports that a new Cedric Street entry opened on 5 September 2026, while the Stephenson Avenue car park access became left-in, left-out only. If you are driving to the station, use the signed approach appropriate to your direction rather than assuming the old access pattern still applies.
Rank #3
- Bright, high-resolution 5” glass capacitive touchscreen display lets you easily view your route
- Get more situational awareness with alerts for school zones, speed changes, sharp curves and more
- View food, fuel and rest areas along your active route, and see upcoming cities and milestones
- View Tripadvisor traveler ratings for top-rated restaurants, hotels and attractions to help you make the most of road trips
- Directory of U.S. national parks simplifies navigation to entrances, visitor centers and landmarks within the parks
The broader project also upgraded the Stirling Bus Interchange from 18 to 29 stands; Main Roads says it opened to passengers on 2 August 2026. A new Mitchell Freeway Principal Shared Path connection between Civic Place and Telford Crescent is 1.4 km long and four metres wide, according to the project page. Main Roads also cites a forecast of more than 6,000 rail boardings by 2031; that is a prediction, not a current passenger count.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Check for active roadworks before setting out
Construction notices and detours can change. Main Roads lists dated overnight closures and detour maps on its project page, so check the live listing before you travel rather than relying on an old closure notice. At the time the page was reviewed in October 2026, it included dated closures around 5–9 October and intermittent freeway lane closures extending later in 2026; those notices are time-sensitive and may no longer apply.
- For southbound freeway access, follow signs to Stephenson Avenue southbound on-ramp.
- For northbound access, use the Stephenson Avenue northbound ramp, which opened on 3 April 2026, and follow current detour signs if works affect your approach.
- For local roads or Stirling Station, check the current Main Roads map and follow posted access restrictions.
Check Main Roads WA’s Stephenson Avenue Extension updates and detour maps before departure.
Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.
Do these 3 things before closing this tab:
1Fix the driver behind crashes, sound loss and screen glitches2Repair Windows errors before they cause bigger problems3Scan for outdated or missing drivers - takes under a minute




