October DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsPC HealthRecommendedCrashes, freezes, slowdowns? Check your PC nowSpot repairable issues before they interrupt work.Check PCOctober DealsAmazon USDeal season is back - check today's better picksAmazon US: current deals, useful picks and tech finds.See Picks×
Skip to content
CarCodyAdvertise
Service recordThe Garage

Lilium’s Shutdown Became Permanent After a Failed Rescue; About 1,000 Jobs Were Lost

Lilium stopped operating and laid off about 1,000 workers in December 2024, but a short-lived rescue preserved roughly 775 jobs before Lilium Aerospace filed for insolvency in February 2025. Archer later bought approximately 300 Lilium patent assets for €18 million.
Entry335 Date Time8 min MechanicCarCody Team

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Lilium did not simply disappear after the December 2024 reports that it had ceased operations. The electric-aircraft startup stopped operating and laid off about 1,000 workers on or around December 23, 2024, after failing to secure enough financing. A short-lived rescue transaction transferred operations to a new company, Lilium Aerospace, in early January 2025 and temporarily preserved roughly 775 jobs. That rescue failed when essential follow-on funding did not arrive, and Lilium Aerospace filed for insolvency and stopped operations on February 21, 2025.

The company’s technology also had a post-collapse life: Archer Aviation bought approximately 300 Lilium patent assets for €18 million in October 2025. That sale did not revive Lilium as an aircraft manufacturer.

As an Amazon Associate I earn from qualifying purchases.

What happened to Lilium?

Lilium, the German electric vertical-takeoff-and-landing aircraft startup, ran out of financing while its aircraft was still in development and years away from commercial delivery. Its principal German operating subsidiaries, Lilium GmbH and Lilium eAircraft GmbH, filed for insolvency in late October 2024 after a government-backed financing route failed.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

By December 23, Lilium had ceased operations and laid off approximately 1,000 employees, according to contemporaneous reporting. The immediate shutdown was followed by an attempted rescue rather than a clean, final liquidation. On December 24, an investor consortium agreed to acquire the operating subsidiaries through a new structure. Business operations moved to Lilium Aerospace in early January 2025 after substantial parts of the purchase price were paid.

#1 Best Overall
Metalkitor T56-A-15 Turboprop Engine Model Kit, C-130 Hercules Aircraft Engine Cutaway Display Model with Spinning Propeller, Electric Powered Desktop Aviation Decor
  • 🔧 Realistic Turboprop Design – Based on the iconic T56-A-15 engine from the C-130 Hercules, this model features detailed compressor, turbine, and gearbox components for an impressive visual replica.
  • 🛠 Cutaway Structure for Display – Side-open casing reveals internal mechanics, offering a dynamic view of engine operation, perfect for hobbyists, collectors, and aviation fans.
  • ⚙️ Functional Propeller Mechanism – The multi-blade propeller spins when powered, simulating real engine behavior and bringing the model to life.
  • 🔌 Electric Power Base – Comes with a display base featuring labeled switches for controlled motion of propeller and interior parts. A standout piece for desks, shelves, or exhibits.
  • 🎨 High-Quality Build – With precision assembly, riveted exterior detailing, and bold color accents (red, silver, black), this model offers both durability and authenticity.

That continuation was temporary. Lilium Aerospace filed for insolvency on February 21, 2025, after the financing needed to keep the business operating failed to materialize. The company said a restructuring was highly unlikely and that operations would stop.

The accurate timeline is: initial shutdown and mass layoffs in December 2024; temporary continuation under Lilium Aerospace in January 2025; final reported operational stop after the successor’s insolvency filing on February 21, 2025.

Lilium’s collapse timeline

Date Event Why it mattered
October 17, 2024 Germany’s federal budget committee declined to approve a €50 million guarantee connected to a proposed €100 million convertible loan. Lilium lost a crucial element of its planned government-backed financing. Lilium and Bavaria also had not reached agreement on an additional guarantee.
October 28–29, 2024 Lilium GmbH and Lilium eAircraft GmbH filed for insolvency and sought self-administration. The operating subsidiaries could no longer obtain enough financing to continue normally.
November 2024 Lilium pursued an M&A and asset-sale process with KPMG’s assistance. The company warned in a U.S. Securities and Exchange Commission filing that liquidation was possible and that it did not expect proceeds for Lilium or its shareholders.
December 23, 2024 Lilium ceased operations and laid off about 1,000 workers. This was the shutdown reported in the original headline.
December 24, 2024 An investor consortium agreed to acquire the operating subsidiaries through a new structure. The transaction created a chance to preserve the aircraft program and jobs.
Early January 2025 Operations transferred to Lilium Aerospace. Approximately 775 jobs were temporarily preserved.
February 21, 2025 Lilium Aerospace filed for insolvency. The necessary follow-on financing had not materialized, and operations stopped.
March 12, 2025 Lilium N.V. disclosed that regular insolvency proceedings had begun. The proceedings were intended to wind up the company, with shareholders not expected to receive distributions.
October 15, 2025 Archer Aviation acquired much of Lilium’s patent and registered-intellectual-property portfolio. The transaction transferred important technology assets without reviving Lilium’s operating business.

Why did Lilium fail?

The central problem was a financing shortfall, not one isolated missed loan payment. Lilium was attempting to fund an expensive aircraft-development program while it remained years from commercial delivery. It needed private capital and government-backed support at the same time that investors were being asked to finance certification, manufacturing, testing, infrastructure and other costs that precede aircraft revenue.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

In October 2024, Lilium said Germany’s federal budget committee would not approve the proposed guarantee for a €100 million convertible loan. The company and Bavaria also failed to reach an agreement on a further guarantee. Without that support, the German subsidiaries entered insolvency.

Lilium then tried to find buyers or investors through an M&A and asset-sale process. That effort produced the December consortium transaction and the January transfer to Lilium Aerospace, but the new company still required additional financing. When that funding failed to arrive, the rescue could not continue.

Lilium N.V.’s SEC disclosures said the company could not raise sufficient funds to continue its business and that its board no longer believed a positive going-concern position existed. In practical terms, the company’s cash needs outlasted its ability to raise money.

What happened to the 1,000 workers?

The approximately 1,000 layoffs reported in December 2024 represented most of Lilium’s workforce at the initial shutdown. The later figure of roughly 775 jobs temporarily preserved under Lilium Aerospace is not a contradiction. It describes a different stage of the restructuring and a different employing entity.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The rescue company briefly retained a substantial workforce so development could potentially continue. That preservation did not become a durable restart: Lilium Aerospace entered insolvency in February 2025, and the successor’s operations stopped.

The available reporting does not establish an exact final layoff total for every stage of the process. The most accurate descriptions remain “about 1,000 layoffs” for the December shutdown and “approximately 775 jobs temporarily preserved” during the January rescue.

What was Lilium building?

Lilium was developing the Lilium Jet, an all-electric vertical-takeoff-and-landing aircraft, commonly grouped with the emerging eVTOL or advanced-air-mobility sector. Its design used electric propulsion and distributed ducted-fan technology rather than conventional aircraft engines.

Before the collapse, Lilium reported that its first full-scale aircraft had reached an initial low-voltage power-on milestone and that two aircraft were in final assembly. Those were development milestones—not evidence that the aircraft had entered commercial service, completed certification or begun regular passenger operations.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

This distinction matters. Aircraft startups can demonstrate subsystems, assemble prototypes and perform test work long before an aircraft is certified for paying passengers. Lilium’s insolvency occurred while the program remained in development.

Rank #3
TECHING Metal Twin-Spool Turbofan Engine Model Kit that Works, 1000+ Parts
  • DETAILED TWIN-SPOOL ARCHITECTURE: This 1:10 scale model recreates the layered structure of an aerospace turbofan engine, including a single-stage fan, two-stage low-pressure compressor, four-stage high-pressure compressor, single-stage high-pressure turbine, and two-stage low-pressure turbine.
  • PRECISION METAL CRAFTSMANSHIP: Made from precision-cast and CNC-machined metal components, the model features sandblasted and anodized surfaces for durability, refined texture, and a professional industrial finish. Its substantial construction highlights the complexity of modern turbofan engineering.
  • MOTORIZED AND FULLY VISIBLE: The cutaway engine casing reveals the internal rotating assemblies as the motor simulates coordinated turbofan operation. A fixed display stand, throttle control lever, and engine sound module create a more engaging mechanical demonstration.
  • 1000+ PART ASSEMBLY PROJECT: Build the engine from more than 1,000 components, including screws and nuts. Tools and an English instruction manual are included. The manufacturer estimates approximately 10 hours of assembly time. The multi-stage process is intended for experienced model builders familiar with small components and detailed mechanical assembly.
  • IMPRESSIVE ENGINEERING DISPLAY: Measuring approximately 14.96 × 6.50 × 9.25 inches and weighing about 11.68 pounds when completed, the DM119 becomes a commanding mechanical centerpiece for a home, office, studio, workshop, or aviation-themed collection.

Did Lilium’s technology disappear?

No. The operating company failed, but parts of its intellectual property remained valuable. On October 15, 2025, insolvency administrator PLUTA announced the sale of Lilium’s patents and registered intellectual-property rights to Archer Aviation.

Archer said it won a competitive bid for approximately 300 advanced-air-mobility patent assets for €18 million. The portfolio included technology related to:

  • high-voltage systems;
  • battery management;
  • aircraft design;
  • flight controls;
  • electric engines;
  • propellers; and
  • ducted fans.

The patent sale should not be confused with an acquisition of the entire Lilium aircraft program. A FlightGlobal report said two Lilium Jet prototypes were separate from Archer’s patent purchase and remained among the assets being considered for sale at that time. PLUTA also said remaining assets would continue to be realized for creditors.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What does the failure mean for Lilium investors?

Lilium’s corporate structure made the outcome more complicated than a single factory closure. Lilium N.V. was the listed parent, while Lilium GmbH and Lilium eAircraft GmbH were among the German operating subsidiaries that entered insolvency. Lilium Aerospace was a successor company created for the attempted rescue.

In its SEC disclosures, Lilium warned that insolvency proceedings could lead to liquidation and that proceeds would first be used for insolvency costs and creditors. In March 2025, the company said Class A shareholders should not expect distributions.

That is a familiar risk in capital-intensive startups: an operating business can have valuable patents, prototypes or other assets while still leaving little or nothing for equity holders after secured claims, insolvency expenses and other creditor obligations are addressed.

Rank #4
WngAur Airplane Model, Ryanair Aircraft Die-cast Metal Planes Suitable for Collection and Desktop Decor
  • Durable Construction: The fuselage is made of metal material, The wings are made of plastic, which can be played and displayed for a long time.
  • Realistic Design: Beautifully crafted model airplane, it is a beautiful decorative item.
  • Compact Size:Measures approximately 6 inches long and fits easily on desks, offices, bookcases, and displays
  • Movable Parts: With sliding wheels, it can simulate the take-off condition for any occasions.
  • Excellent Gift: Whether as a birthday, Christmas gift for modeling enthusiasts or family and friends, this airplane model is the best choice.

Why the original “ceased operations” report needs a date qualifier

The December 2024 report was materially correct when published. Lilium had stopped operating at that point and about 1,000 employees had lost their jobs. But “ceased operations” did not mean that every Lilium-related entity, asset or legal proceeding ended on that date.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The December 24 rescue announcement came one day later. Operations then transferred to Lilium Aerospace in early January, temporarily preserving about 775 jobs. The final reported operational stop came after Lilium Aerospace filed for insolvency on February 21, 2025.

For that reason, a current description should not say that Lilium “never found an investor.” It did find a consortium willing to complete a rescue transaction, but the successor could not secure the additional financing required to continue. Nor should a current report imply that Lilium resumed production, achieved certification or entered passenger service; the available evidence supports none of those claims.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What this says about electric-aircraft startups

Lilium’s collapse illustrates the unusually long funding runway required to bring a new aircraft from design to commercial operation. The company had to finance an aircraft program before it could generate meaningful delivery revenue, while also navigating certification, production scale-up, supply-chain commitments and infrastructure questions.

It also shows why government guarantees can be pivotal in emerging aviation markets. The proposed German support was not the whole of Lilium’s funding plan, but its failure weakened the company’s ability to attract or secure the capital needed to continue. The subsequent investor transaction bought time, not financial independence.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Finally, the Archer transaction demonstrates that an aircraft startup’s intellectual property may retain value even after its business fails. That does not mean the original product will reach the market. It means individual technologies can be separated from the company, sold to another aviation developer and potentially used in a different commercial strategy.

Best Value
SEBUNAS 1:72 F-14 Tomcat 3D Quick Build Model Kit Fighter Jet Aircraft
  • Experience the legendary F-14 Tomcat through a highly detailed model designed for aviation collectors and hobby enthusiasts. The finished model becomes a striking desktop or showcase centerpiece.
  • This 3D puzzle is designed for beginner-level assembly enthusiasts, offering an immersive hands-on building experience that helps cultivate patience, concentration, and mechanical problem-solving skills.
  • This product is manufactured using high-quality, environmentally friendly plastic and employs an ultra-fine etching process to ensure durability, structural precision, and realistic aircraft details.
  • Encourages understanding of aircraft engineering concepts while improving hand-eye coordination and spatial thinking through engaging mechanical assembly.
  • Ideal gift for childs, engineers, collectors, model builders, and puzzle lovers for birthdays, Children’s Day, Christmas, or special hobby occasions.

Bottom line

Lilium’s December 2024 shutdown was the first major operational collapse, not the final entry in the story. About 1,000 workers were laid off after financing efforts failed. A rescue briefly transferred operations to Lilium Aerospace and preserved around 775 jobs, but that company filed for insolvency on February 21, 2025, after follow-on financing failed. By October 2025, Archer Aviation had acquired approximately 300 Lilium patent assets for €18 million, while the remaining assets continued through insolvency proceedings.

Lilium’s aircraft program therefore ended as a commercial operating business, even though some of its technology survived as intellectual property.

Frequently Asked Questions

When did Lilium cease operations?

Lilium’s initial shutdown and layoffs were reported on or around December 23, 2024. Operations briefly continued under successor company Lilium Aerospace after a January 2025 rescue transaction, but Lilium Aerospace filed for insolvency and stopped operations on February 21, 2025.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How many Lilium employees lost their jobs?

About 1,000 workers were laid off during the December 2024 shutdown. A later rescue temporarily preserved approximately 775 jobs under Lilium Aerospace, but that arrangement ended when the successor entered insolvency.

Did Lilium ever produce a certified passenger aircraft?

The available evidence does not show that the Lilium Jet entered commercial passenger service or completed certification. Lilium had reported development milestones, including an initial low-voltage power-on milestone and aircraft in final assembly, but those are not commercial-service milestones.

Who bought Lilium’s patents?

Archer Aviation acquired approximately 300 Lilium patent and registered-intellectual-property assets in October 2025 for €18 million, according to Archer and insolvency administrator PLUTA. The acquisition did not amount to a revival of Lilium’s operating company.

What happened to Lilium shareholders?

Lilium’s SEC disclosures said insolvency proceeds would first go to costs and creditors. In March 2025, the company said Class A shareholders should not expect distributions.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

More from the Garage

  1. Entry001Date09 OCT 26Time3 minWhich Brake Pad Should You Buy From RockAuto or Elsewhere?Section: Blog
  2. Entry002Date09 OCT 26Time5 minThe Pros and Cons of Touchless Car Wash SystemsSection: Blog
  3. Entry003Date09 OCT 26Time3 minCan a Trickle Charger or Battery Tender Properly Charge a Car Battery?Section: Blog

Thanks for visiting Carcody

Carcody.com is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to amazon.co

Recommended PC Tool
Recommended PC Tool
PC Slower Than It Used to Be?Free scan - under a minute
Outdated Drivers Are Slowing You DownFree scan - exact matches

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.